Merge lp://staging/~cyphermox/indicator-power/inline into lp://staging/indicator-power/13.04

Proposed by Mathieu Trudel-Lapierre
Status: Merged
Approved by: Allan LeSage
Approved revision: 168
Merged at revision: 155
Proposed branch: lp://staging/~cyphermox/indicator-power/inline
Merge into: lp://staging/indicator-power/13.04
Diff against target: 402 lines (+366/-0)
7 files modified
.bzr-builddeb/default.conf (+2/-0)
debian/changelog (+259/-0)
debian/compat (+1/-0)
debian/control (+35/-0)
debian/copyright (+37/-0)
debian/rules (+20/-0)
debian/source_indicator-power.py (+12/-0)
To merge this branch: bzr merge lp://staging/~cyphermox/indicator-power/inline
Reviewer Review Type Date Requested Status
PS Jenkins bot (community) continuous-integration Needs Fixing
Didier Roche-Tolomelli Approve
Review via email: mp+134525@code.staging.launchpad.net

Description of the change

Import debian/

To post a comment you must log in.
Revision history for this message
Didier Roche-Tolomelli (didrocks) wrote :

With the last commit, everything is fine in pbuilder. +1 from me :)

review: Approve
Revision history for this message
PS Jenkins bot (ps-jenkins) wrote :
review: Needs Fixing (continuous-integration)
Revision history for this message
Allan LeSage (allanlesage) wrote :

Will adjust our Jenkins config for inline and try again.

Revision history for this message
PS Jenkins bot (ps-jenkins) wrote :
review: Approve (continuous-integration)
Revision history for this message
PS Jenkins bot (ps-jenkins) wrote :

FAILED: Autolanding.
No commit message was specified.

review: Needs Fixing (continuous-integration)
Revision history for this message
Allan LeSage (allanlesage) wrote :

Rectified config, commit message won't be necessary.

Preview Diff

[H/L] Next/Prev Comment, [J/K] Next/Prev File, [N/P] Next/Prev Hunk
The diff is not available at this time. You can reload the page or download it.

Subscribers

People subscribed via source and target branches