SOme local tests (see the ones at the beginning) have a duration of 10 seconds, while the ones at the end have 0.250 seconds. We should standardize them all. Remember this is only the local job that generates the sub-jobs; the subjobs themselves have their own duration specified elsewhere.
SOme local tests (see the ones at the beginning) have a duration of 10 seconds, while the ones at the end have 0.250 seconds. We should standardize them all. Remember this is only the local job that generates the sub-jobs; the subjobs themselves have their own duration specified elsewhere.